An order for 5,000 bottles does not necessarily produce 5,000 complete packs. Start with one pack’s parts and check who is supplying each. Then discuss any extra quantity with the filling partner.

Write the base quantity without extras
Illustrative example: if each finished pack uses one bottle, one pump and one cap, a target of 5,000 packs starts with 5,000 of each. List separate collars or inserts if they are not included in those supplied assemblies.
Check the quotation scope before adding lines. A pump price may already include its collar; a cap price may include its insert. Counting the same part twice can be as confusing as leaving it out.
Show setup and spares separately
Ask the filling partner what allowance the actual process needs for setup, checks or replacements. Request the reason for the proposed quantities. Do not apply one arbitrary percentage to glass, pumps and caps just because it is convenient.
Keep those extras visible in the quotation and purchase order so both teams can distinguish the production target from the supplied quantity.
Reconcile quantities before filling
- Check minimums for each model and finish.
- Confirm carton multiples and any part-carton arrangement.
- Count separately supplied components against the packing list.
- Identify shortages before allocating the filling run.
- Label remaining stock with its reference and version for the next order.
Use the carton calculator separately for each packing line. It can estimate cartons from quantities; it cannot decide the spare allowance for your production process.
Explore products for this decision
Use these options to build your shortlist, then request the drawings or samples needed for your project.
Compare current shapes, sizes and bottle families.
View the options →COLLECTION / SERVICEPerfume spray pumpsBrowse pump configurations and nominal neck options.
View the options →COLLECTION / SERVICEPerfume cap collectionsCompare pictured finishes, construction and cap families.
View the options →These are options to compare. A product link does not establish compatibility between separately selected parts.